Typical easement widths in Colorado
115 kV single-circuit: 75–100 feet total width, centered on the line.
230 kV single-circuit: 125–150 feet.
345 kV single-circuit: 150–200 feet. Double-circuit or bundled corridors can exceed 250 feet.
The Colorado Power Pathway, currently under construction across the eastern plains, uses a 200-foot easement for its 345 kV segments.
What the easement typically prohibits
Permanent structures of any kind, including barns, sheds, and residences.
Trees or vegetation exceeding 15 feet at maturity.
Above-ground fuel storage, propane tanks, and hay stacks (fire clearance).
Ponds or excavations that would undermine tower foundations.
Signage, antennas, or communication towers without utility consent.
What is usually allowed
Row-crop agriculture, grazing, and hay production.
Driveways and gravel access roads crossing the easement at 90 degrees.
Center-pivot irrigation, provided sprinklers clear the conductor sag envelope.
Fencing under 8 feet, with metal gates where towers require access.
Residual value math
Colorado condemnation practice values easement-encumbered land at 40–70% of unencumbered market value, depending on parcel shape and how much productive ground the easement sterilizes. A quarter section (160 acres) crossed diagonally by a 200-foot corridor loses roughly 4.8 acres of usable ground plus adjacency penalty on the rest.
For rural residential valuations, the standard adjustment in Weld, Morgan, and Logan counties is a 5–12% deduction on the whole parcel when the easement crosses the building envelope, and 0–3% when it clips a corner.